PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing duct work hangers at the 3rd floor Facing North-West (800x600).jpg Continued welding the remaing tube steel at the main steel column (Monumental Stairs) Facing South (800x600).jpg Duct and pipe hangers at the 2nd floor Facing West (800x600).jpg Installed gas piping risers at the 2nd floor by Elev. 5,6 Facing West (600x800).jpg Patching Stair -2 at the 1st floor Facing South (800x600).jpg Started Fireproofing at the 1st Floor Facing West (800x600).jpg Take off the pocket forms at Stair -2 (800x600).jpg
Previous pageNext page Patching Stair -2 at the 1st floor Facing South (800x600)
Patching Stair -2 at the 1st floor Facing South (800x600)